您要查找的是不是:
- main shaft equipment' s 主軸裝置
- main shaft equipment 主軸裝置
- It s a important join component of hydrogenerator main shaft fasten joint bolt. 水輪發(fā)電機主軸聯(lián)軸螺栓是水輪發(fā)電機重要的聯(lián)接部件。
- The hollow stemlike main shaft of a feather. 翎管羽毛的中空的莖狀羽干
- The application of die plate in shaft equipment installation is introduced. 介紹了模具盤(pán)在井筒裝備安裝中的具體應用。
- A secondary mine passageway between two main shafts or tunnels. 次要礦山甬道礦井中連接兩條大隧道的小巷道
- The hoisting device serving the main shaft of Yinying Mine is not able to meet the need of production,so it is necessary to make reform for the main belt conveying equipment of the hoisting. 蔭營(yíng)煤礦主井提升設備不能滿(mǎn)足生產(chǎn)要求,因此對設備的主膠帶輸送裝置進(jìn)行改造。
- The bottom bearing applies both labyrinth seal and frame seal, which have good performance of sealing. The main shaft is anticorrosive. 下軸承端蓋密封采用雙重密封,可確保密封效果,主軸采用防腐新技術(shù),能保護主軸免受腐蝕。
- This machine is specially designed for plucking guard hair of mink.The speed of the main shaft is infinitive variable. 該機器是專(zhuān)門(mén)用于對水貂的針毛進(jìn)行拔除的專(zhuān)用設備。主軸無(wú)級調速。
- The structure of the main shaft bearing assembly can decide its using conditions. 主軸軸承的結構形式又決定了螺桿鉆具的使用條件。
- According to the conditions of main shaft,choosing appropriate method to decide the best solution. 并根據主軸的實(shí)際情況,選擇合適的尋優(yōu)方法,進(jìn)而確定最優(yōu)解。
- The paper points out the reasons of the main shaft rupturing of mine hoisting and gives out the preventive measures. 指出了提升機主軸產(chǎn)生實(shí)際危險截面的原因,并進(jìn)行了理論分析,進(jìn)而給出了預防方法。
- When using main shaft at the same time ,diving ,chamfering and cutting can be done at one time . 主軸同時(shí)使用權進(jìn),分切、倒角、切斷可以一次成型。
- The original through the systematic tunnel of such power supply and main shaft trad... 文章從其供電系統巷道、主井換尾繩斜巷、井底煤倉三個(gè)方面做具體的優(yōu)化方案介紹。
- There are eccentric wheel,rubber software,main shaft and shaft-bearing in the vibrating chamber. 振蕩室內有偏心輪、橡膠軟件、主軸、軸承等組成。
- The defection of the main shaft on the cylinders should be readjusted to a limit of 5 mm. 汽缸的主軸拐檔差應調到5毫米內。
- Three points of screws No. 1 in the vertical driving cam and the feed driving cam, and screw No. 2 in the main shaft thrust collar are nearly aligned. 上下送布凸輪、水平送布凸輪的第1螺絲、上軸滑環(huán)的第2螺絲的3點(diǎn)基本對齊。
- transportable correcting shaft equipment 可移動(dòng)式直軸設備
- The actual application of FCD series main shaft oil to lubricating system of imported equipments in our plant was described. 介紹了FCD系列主軸油在我廠(chǎng)進(jìn)口設備潤滑系統上的實(shí)際應用,并將FCD系列主軸油與進(jìn)口油作了比較。
- When timer is being assembled, main shaft and face plate mouth are not homocentric, make main shaft gets stuck, hard restoration. 定時(shí)器在裝配時(shí),主軸與面板口不同心,使主軸卡住,難以復位。