您要查找的是不是:
- The flared fitting is a connector in order the pipe line system, in which oil, water, gas and all kinds of corrosive materials are used as the medium. 擴口式管接頭是以油、水、氣和各種腐蝕性材料為介質(zhì)的管路系統中的一種連接件。
- Spiral tube used in pipe line system for curing press 螺旋盤(pán)管在定型硫化機管路系統中的應用
- interconnected pipe line systems 互連管線(xiàn)系統
- Diss' pipe line system 迪斯(氏)管道系統
- Preliminary talk on the modification of pipe line system for rubber proof sheet extruding curing production line 淺談橡膠防水片材擠出連續硫化生產(chǎn)線(xiàn)管路系統的改進(jìn)
- subsea pipe line system 海底管線(xiàn)
- Protective gas system: pipe line from the protective gas generation station to reducing annealing furnace. 保護氣系統:從保護氣體發(fā)生站至還原退火爐的管道。
- An assembly line system is an efficient way to manufacture cars. 產(chǎn)品裝配線(xiàn)系統是一種有效的生產(chǎn)汽車(chē)的方法。
- Gas system: gas pipe line from the joint at 1m from the workshop outside wall to industrial furnaces. 燃氣系統:從車(chē)間外墻外1米處的接點(diǎn)至工業(yè)爐的燃氣管道。
- Debris in pipe line is too fine to be trapped by strainer. 管線(xiàn)內的碎片太細小導致過(guò)濾器無(wú)法截留。
- For on-line calibration system of flowmeter, the working fluid flow is from the petroleum pipe line itself. 體積管工作時(shí)的液流,對于流量計在線(xiàn)檢定系統,是來(lái)自輸油管線(xiàn)本身;
- Standard Specification for Cured-in-Place Pipe Lining System for Rehabilitation of Metallic Gas Pipe 用于金屬煤氣管修復的準地方處理管襯套系統規范
- DWTT separation fracture has been analyzed for pipe line steel. 摘要文章對管線(xiàn)鋼DWTT試樣上出現的分離斷口進(jìn)行了分析。
- Maximum continuous flow based on pipe line velocity of 20 ft. per second. 最大持續流量以管路流速每秒20英尺為計算基礎。
- Constructs, maintains and repairs overhead line systems. 建造、保養及修理架空電線(xiàn)系統。
- Prior to installation, thoroughly flush pipe line to remove any foreign matter. 在安裝之前,徹底沖洗管線(xiàn),清除任何外來(lái)物質(zhì)。
- Technical and Economic Analysis on Design of Production Pipe Line of C.P.P. 選煤廠(chǎng)生產(chǎn)管道設計的技術(shù)經(jīng)濟分析。
- However, sharks do sense sound as pressure through their lateral line system, and ..... 然而,鯊魚(yú)是用水壓經(jīng)過(guò)側線(xiàn)系統來(lái)感受聲波.....
- Maximum intermittent flow based on pipe line velocity of 25 ft. per second. 最大間歇流量以管路流速每秒25英尺為計算基礎。
- Teng, J.-H., C.-S.Chen, T.-C.C.Wang, Y.-L.Chen;2000:Orographic Effects on a Squall Line System over Taiwan. 王時(shí)鼎、謝信良、鄭明典與葉天降,1998:侵臺臺風(fēng)流型與臺風(fēng)路徑走向間之關(guān)系研究。