您要查找的是不是:
- Remove the body bolts from the valve body. 從閥體上拆卸閥體螺栓。
- Lift retainer and check assembly from valve body. 從閥體內取出護圈和止回閥總成。
- Screw the cover onto the valve body. 將閥蓋旋在閥體上。
- Turn handle to be perfectly perpendicular to valve body. 將手柄旋轉到與閥體完全垂直的位置。
- Remove the body bolts from valve body using Allen Key. 采用內六角扳手從閥體上拆卸閥體螺栓。
- Installation suggestion: valve body vertical and upward. 建議安裝方式,閥體垂直向上。
- IMPORTANT! Flow must always be in direction of arrow on valve body. 重要提示!水流流向必須與閥體上的箭頭方向一致。
- Insert valve body through mounting hole and seat lugs. 將閥體插入安裝孔和密封連接盤(pán)。
- Press stem/ball into valve body and remove from open end. 將閥桿/球體壓入閥體內,并且從開(kāi)口端卸下來(lái)。
- The top of retainer must drop just below threads in the valve body. 護圈上方必須放置在閥門(mén)閥體螺紋以下。
- Slide one half of the splash guard into the groove on the relief valve body. 將防濺保護的一半滑動(dòng)到安全閥閥體的溝槽上。
- Install valve in the direction of the flow arrows on the valve body. 按照閥體上的箭頭方向安裝閥門(mén)。
- Assigning the ideally fitted wedge, ground and lapped, to proper valve body. 將研磨后的楔板分配到最適合的閥體上。
- Reinstall the valve body and union nuts only after the joint has fully cured. 只有在連接完全成功粘固后,才能夠重新安裝閥門(mén)閥體。
- MAXON's A Style Synchro flow control valve bodies are designed to meet ANSI flange specifications. MAXON的A型同步流量控制閥閥體的設計滿(mǎn)足ANSI的法蘭規格要求。
- Gear operator is removed by unscrewing hex head screws which hold operator to valve body. 通過(guò)擰松將操作機構固定在閥體上的六角螺栓來(lái)拆卸齒輪操作機構。
- This construction avoids the need for extending the pivot pins through the valve body. 這種結構消除了將樞軸銷(xiāo)伸長(cháng)穿出閥體的必要性。
- Install new retainer module assembly into valve body by aligning "U" shaped cutout in retainer with the valve outlet. 通過(guò)對齊護圈上和閥門(mén)出口的"U"形切口,將新的護圈模塊總成裝配到閥體內。
- Thedry quick isolating valve can bring about quick j oint and cut off of the valve body withno leakage of liquid. 干式快速切斷閥能夠實(shí)現閥體的快速對接和斷開(kāi),不存在流體泄漏的現象。
- Valve body uses comol material,lt is corrosion resistant and wear and tear resistant. 閥體材質(zhì)絡(luò )鉬鋼,耐腐蝕、耐磨損、經(jīng)久耐用。