您要查找的是不是:
- Analysis on Benefit of Power Transmission from Three-gorges Underground Power Station to North China and Central China Power Network 三峽地下電站送電華北及華中電網(wǎng)的效益分析
- Nowadays, the incoming transmission lines to TPC's indoor substation come from transmission tower via underground power cable. 摘要:現行臺電公司有部分的屋內型變電所外線(xiàn)引入方式是從屋外輸電鐵塔經(jīng)地下電纜引入變電所。
- Fluid power Transmission International Exhibition. 國際液壓動(dòng)力展。
- Nord China Power Transmission Co., Ltd. 諾德中國傳動(dòng)設備有限公司。
- New 220-kilovolt power transmission project cities. 新建大城市220千伏輸變電工程。
- New 110 kilovolt power transmission project cities. 新建大城市110千伏輸變電工程。
- M.Murata. A GIS application for power transmission line siting. 邊馥苓.;GIS地理信息系統原理和方法
- They were undergrounding power lines. 他們正鋪設地下電力線(xiàn)。
- Power transmission and control play a role in all industry sectors. 電力傳輸和控制在所有的工業(yè)領(lǐng)域都扮演著(zhù)重要的角色。
- The tailwater damping well for the Three Gorges underground power plant is built in narrow space with high safety risk. 摘要三峽地下電站尾水阻尼井具有施工環(huán)境小、安全隱患大、施工工期緊、過(guò)流麗質(zhì)量要求高等特點(diǎn)。
- The layout of underground power house of Baise project is limited by the special geologic condition. 百色水利樞紐地下廠(chǎng)房布置受地質(zhì)條件的限制性較強。
- They were undergrounding power lines. 他們正鋪設地下電力線(xiàn)。
- Monitoring of Slope Stability of Qingshan Spillway and Rock Wall Stability of Access Tunnel of Zhouning Underground Power Station in Fujian Province. 福建芹山水電站溢洪道邊坡及周寧水電站地下廠(chǎng)房交通洞巖壁穩定監測。
- The design process and the general layout of the rightbank underground power station of TGP and its construction opportunity are described. 介紹了三峽右岸地下電站設計過(guò)程、總體布置及興建時(shí)機的研究。
- Based on the measured data of initial geostress and engineering conditions in the region of an underground power plant, the factors affecting the initial geostress are discussed. 摘要結合某抽水蓄能電站地下廠(chǎng)房區工程地質(zhì)條件以及實(shí)測地應力資料,分析影響區域初始地應力的因素;
- In this layout, the diversion tunnel adopts the two-machine, the two-tunnel and underground power house, and the tailrace tunnel adopts the two-machine and one-tunnel. 尾水洞為兩機一洞布置,兩個(gè)進(jìn)水口布置在二期廠(chǎng)房與白山水庫泄洪洞沖坑之間的左崖山體處;
- Tan Ping-an Docent. His research interests include Power electronics and power transmission. 譚平安講師,研究方向為電力電子與電力傳動(dòng)。
- This paper raises to design the management information system for power transmission network based on GIS. 本論文從電力系統輸電網(wǎng)絡(luò )管理的要求出發(fā),結合生產(chǎn)實(shí)際,提出在地理信息系統(gis)的基礎上,構建杭州電力局的輸電網(wǎng)絡(luò )生產(chǎn)管理系統。
- Planned power transmission and distribution projects will be completed to introduce power from the surrounding area into Beijing. 完成計劃中的相關(guān)輸配電工程,積極由首都周邊地區引進(jìn)電力資源。
- Four power tunnels, an underground power cavern with a length of 123.2m width of 21.2m and height of 50m on the left bank, access tunnels, ventilation tunnels, bus shafts, tailrace gate chambers and tunnels. 四個(gè)動(dòng)力坑道;一個(gè)地下動(dòng)力涵洞;長(cháng)123.;2米;寬21