您要查找的是不是:
- A drainage passage, as to a culvert. 排水溝排水通道,如陰溝
- The control section of the spillway in the reservoir generally is the spilling weir.But the spill-weir with the sluice culvert is infrequent in the hydraulic work. 摘要水庫溢洪道控制段一般為溢流堰形式,而堰體中有泄水洞的溢流堰在水利工程中并不多見(jiàn)。
- They ran for the culvert and ducked in. 他們跑到涵洞跟前,鉆了過(guò)去。
- The spillway face are RCC benched spillway face. 溢流壩面為碾壓混凝土臺階式溢流面。
- Dongfeng hydropower station is open ski spillway. 東風(fēng)水電站溢洪道為明流滑雪式溢洪道。
- Culvert and sluice block and sluice water. 涵閘具有擋水、泄水的作用。
- Proposed dam reinforcement, height, permeability, stability and other engineering measures, calculation of the spillway, culvert layout to enhance the capacity of the regional flood control. 提出了壩體加固、加高、滲透、穩定等工程措施,計算溢洪道、涵洞布置,提高區域防洪能力。
- The importance of a safe spillway cannot be overemphasized. 安全溢洪道的重要性無(wú)論怎樣強調也不會(huì )過(guò)分。
- After days of hard work, the culvert was at last completed. 經(jīng)過(guò)幾天的苦戰,總算把涵洞修好了。
- The spillway is opened and the flood runs down rapidly. 泄洪閘打開(kāi)了,洪水奔流而下。
- Welcome new and old customers call to buy culvert guidance. 歡迎新老客戶(hù)來(lái)電來(lái)涵選購指導。
- JTC has ceased the collection of culvert deposit for new land offers. 裕廊集團不再對新發(fā)配的土地征收排水渠保證金。
- The typical seepage flow field of the bottom for the spillway dam is obtai... 最后計算了典型的壩基滲流流場(chǎng),計算結果與實(shí)驗結果吻合較好。
- The spillway can't be blocked, otherwise it will cause a serious problem. 不能堵塞洩洪道,否則后果不堪設想。
- These culvert pipes will run out after half of the project is completed. 工程進(jìn)行到一半, 這些涵管就用完了。
- Calls to welcome an old friend of the new culvert consulting business! 歡迎新老朋友來(lái)電來(lái)涵咨詢(xún)業(yè)務(wù)!
- The outflow through gate controlled multi-opening spillway of Yinhe Reservoir was analyzed.The analysis results were checked by the site observed data. 分析了音河水庫多孔有閘門(mén)控制的溢洪道出流,并用出流的實(shí)測資料進(jìn)行了檢驗。
- Cracks are easily occurred during construct the reinforced concrete box culvert. 鋼筋混凝土箱涵在施工過(guò)程中,易產(chǎn)生裂縫。
- A major vertical fault scarp formed during the earthquake was less than 1000 ft from the spillway. 地震時(shí)形成的一個(gè)主要的垂直斷層崖,離溢洪道不到1000英尺。
- Compared with the railway bridge and culvert design specifications, the box beam structure design and construction method are seen rational and feasible. 通過(guò)有限元分析結果與鐵路橋涵設計規范的比較得出,該箱梁結構設計合理,施工方案可行。