您要查找的是不是:
- How can it pass the pre-installation self test? 能通過(guò)安裝前的測試嗎?
- The fixed gas detection system with automatic self test. 具有自我自動(dòng)校正功能的固定式氣體偵測系統.
- The fips driver can't load. The driver failed the algorithm self test. fips驅動(dòng)程序不能加載。此驅動(dòng)程序的算法自檢測失敗。
- Once rebooted the PDT should be clear,unless the system actually finds some me?mory problem when doinga self test. 重新啟動(dòng)后,PDT應當空白,除非系統在自檢上確實(shí)發(fā)現有內存問(wèn)題。
- The JL-2 missile program was delayed by the test failure but is continuing to be developed, the officials said. “JL-2 導彈項目因為測試失敗而延遲,但是該項目仍在進(jìn)行中”; 該官員說(shuō).
- Patented Vaginitis Self Test Card provide free of charge can be used for genital health cheek. 贈送陰道炎自我女性腎虛如何調理檢測卡,對生殖器健康進(jìn)行定性檢查。
- Leaving Continue after failure unchecked means that the ordered test will stop running after the first occurrence of a test failure. 不選中“失敗后繼續”表示在首次發(fā)生測試失敗后,順序測試將停止運行。
- To succeed the implementation of the AREVA Technology to Customers' satisfaction for manufacturing transformers without test failure and inside budget. 確保利用AREVA技術(shù)生產(chǎn)制造用戶(hù)滿(mǎn)意的,無(wú)缺陷且控制在成本預算范圍內的變壓器產(chǎn)品。
- With the fast growing portable electronics market and higher need of wafer test, power consumption problem of built in self test (BIST) has attracted more and more considerations. 隨著(zhù)手持設備的興起和芯片對晶片測試越來(lái)越高的要求,內建自測試的功耗問(wèn)題引起了越來(lái)越多人的關(guān)注。
- Integration with test failure management software so that investigators can see test specification data for each failed (automated or manual) test variation. 與測試故障管理軟件集成,因此調查人員可以看到每次失敗的(自動(dòng)或手動(dòng))測試中的測試規范數據。
- Automatic moment limiter has the function of self testing and alarming. 全自動(dòng)力矩限制器具有自動(dòng)檢測和報警功能。
- To succeed the implementation of the AREVA Technology to Customers‘ satisfaction for manufacturing transformers without test failure and inside budget. 確保利用AREVA技術(shù)生產(chǎn)制造用戶(hù)滿(mǎn)意的,無(wú)缺陷且控制在成本預算范圍內的變壓器產(chǎn)品。
- Objectives: 1. To succeed the implementation of the AREVA Technology to Customers' satisfaction for manufacturing transformers without test failure and inside budget. 確保利用AREVA技術(shù)生產(chǎn)制造用戶(hù)滿(mǎn)意的,無(wú)缺陷且控制在成本預算范圍內的變壓器產(chǎn)品。
- This paper presents a segment weighted random built-in self test (SWR-BIST) technique for low power testing. 本篇論文提出了區段加權亂數之低功率自我測試技術(shù)。
- Make analysis report for the test failures and summarize the analysis report. 對測試不過(guò)產(chǎn)品進(jìn)行失效分析,總結分析報告。
- This exam platform not only has g reat convinence for exam of computer culture base,but also offers students a ch ance to get familiar with content of computer grade exam through self test,bett er and faster. 此平臺的應用極大地方便了計算機文化基礎課程的考試;學(xué)生也能進(jìn)行自評自測;更快、更好地熟悉計算機等級考試的內容.
- Function The Pulser Preamplifier can be programmed to inject a sine wave, for the purpose of automated self testing or calibration. 結構脈沖發(fā)生器/前置放大器可用程序控制繪制正選波;目的是進(jìn)行自動(dòng)化自我監測和校正.
- Core tips: General Administration of Quality Supervision recently announced the "black list", a total of 191 batches of imported foreign goods imported in the test failure was due to interception. 核心提示:在國家質(zhì)檢總局近日公布的“黑名單”中,共有191批次進(jìn)口洋貨在進(jìn)境時(shí)因檢驗不合格被攔截。
- Methods The teachers of 3 middle schools and 35 primary schools in Tongcheng were sampled to complete SCL 90 self tests. 方法采用SCL-90癥狀自評表對桐城市3個(gè)鄉鎮隨機抽出3所初中和35所小學(xué)的教師進(jìn)行調查。
- As soon as Jester detects a single test failure, it aborts the run, so failing as early as possible can short-circuit a lot of time-consuming extra tests. 只要Jester發(fā)現一個(gè)測試失敗,就會(huì )終止運行,所以盡早失敗可以短路大量耗時(shí)的額外測試。