By adopting jet grouting, ground water was controlled effectively, and thus further excavation and implementation of the scheme of grouted rubble revetment were ensured. 采用高壓旋噴注裝進(jìn)行止水防滲處理后,地下水得到了有效的控制,保證了基坑進(jìn)一步開(kāi)挖和裝砌塊石護坡方案的順利施工。
The remains of a great circle of standing stones surround the mound. 環(huán)繞在土石堆周?chē)氖且淮笕埲辈蝗牧⑹?/li>
Rescuers are continuing to search the rubble for possible survivors. 救護人員正不停地在石堆中尋找可能生還的人。