您要查找的是不是:
- PSV Pulse Air Shutoff Valve 脈沖空氣切換閥
- Close the shutoff valve upstream of the regulator. 關(guān)閉調節閥上游的關(guān)斷閥。
- Close shutoff valve No. 2 then No. 1. 關(guān)閉關(guān)閉閥2號,然后關(guān)閉關(guān)閉閥1號。
- Close shutoff valve No. 2 then shutoff valve No. 1. 關(guān)閉2號關(guān)閉閥,然后關(guān)閉1號關(guān)閉閥。
- Purpose: To test shutoff valve No. 2 for tightness. 目的:檢測2號關(guān)閉閥的密封性。
- Install a shutoff valve upstream of the regulator. 在調節閥的上游安裝關(guān)閉閥。
- Remove bypass hose from test cock No. 1, open shutoff valve No. 1. 從測試旋塞1號上拆卸旁路軟管,開(kāi)啟1號關(guān)閉閥。
- The test cock is on the inlet side of the shutoff valve. 測試旋塞位于關(guān)閉閥的進(jìn)口一側上。
- Install a shutoff valve in the cold water inlet line. 在冷水進(jìn)水管處安裝一個(gè)關(guān)閉閥。
- Close shutoff valve No. 2 then shutoff valve No. 1 on the assembly. 關(guān)閉2號關(guān)閉閥,然后關(guān)閉總成上的1號關(guān)閉閥。
- Where an air distribution valve manifold is used and its air sub-header shutoff valve is not accessible from the manifold, a shutoff valve at the manifold shall be provided. 如果使用了空氣分布閥門(mén)集管,其空氣分支總管切斷閥不應通過(guò)此集管,而應為集管安裝切斷閥。
- The upper-die-side ambient air shutoff member (11) and the upper-die-side mount base board (15) are rotatably connected by means of axis member (22). 上模側外部氣體遮斷部件(11)與上模側安裝板(15)利用樞軸部件(22)可轉動(dòng)地相連。
- Five kinds of dense\|phase pulse air conveyers and their application in synthetic fiber production were introduced. 介紹了國產(chǎn)5種應用于合成纖維生產(chǎn)中的密相脈沖氣力輸送裝置及其應用。
- No downstream shutoff valves are allowed. 不允許有下游關(guān)閉閥。
- Each instrument requiring an air supply shall be supplied with an individual combination air filter and relief type reducing regulator and an adjacent individual shutoff valve. 要求使用儀表風(fēng)的每個(gè)儀表應配備單獨的混合空氣過(guò)濾器和泄壓型調壓閥及相鄰的單獨切斷閥。
- FLIGHT CONTROLS HYDRAULIC SHUTOFF VALVES. 飛行操縱液壓關(guān)斷活門(mén)。
- The paper mainly introduces the calculate theory of the air shutoff earthwork boats getting over the dam after the construction of the inside dam in the coastal reclamation. 主要介紹在海涂圍墾施工中;在大壩內側施工的閉氣土方船舶完成施工任務(wù)后;翻越大壩的主要理論計算.
- Close shutoff valves No. 1 and No. 2. 關(guān)閉1號關(guān)閉閥和2號關(guān)閉閥。
- Jigging process is such a procedure in which water and particles jump regularly with pulse air so that particles can be stratified according to their own specific gravity. 摘要跳汰分選過(guò)程是水和顆粒兩相流在交變力場(chǎng)作用下,實(shí)現顆粒按密度分層的運動(dòng)過(guò)程。
- Close shutoff valve No. 2 then shut off valve No. 1 on test assembly. 關(guān)閉2號關(guān)閉閥,然后關(guān)閉測試總成上的1號閥門(mén)。