您要查找的是不是:
- process heat reactor 供熱堆
- Of course, the breeder reactor program involved in SIPI was not a routine government program. 當然,“公共情報有限公司科學(xué)家學(xué)院”一案中的增殖反應堆計劃并非一個(gè)慣常的政府計劃。
- It argued, however, that it was not required to prepare an EIS covering the breeder reactor program as a whole. 然而,它還分辯說(shuō),它并未被要求就整個(gè)增殖反應堆建造計劃做一份“環(huán)境影響報告書(shū)”。
- That case, commonly referred to as the SIPI decision, involved the AEC's breeder reactor program. 這一案例,通常被稱(chēng)作SIPI(公共情報有限公司科學(xué)家學(xué)院)決議,涉及到原子能委員會(huì )的增殖反應堆項目。
- A nuclear desalination system using 200 MW nuclear heating reactor and multi-effect distillation process is presented in this paper. 本文提出了200兆瓦核供熱堆與多效蒸發(fā)淡化工藝組合的核能海水淡化方案。
- A HR-200 nuclear desalination system is proposed which consists of one unit of 200 MW(t)nuclear heating reactor and multi-effect distillation (MED)process plant. 提出了利用200MW(t)核供熱堆與多效蒸發(fā)工藝相組合的一種核能海水淡化系統。
- During this process heat energy first converts to unorderly sound waves, then to high frequency sound waves, finally ends up with low frequency sound waves. 這一過(guò)程中能量的轉化是先從熱能到雜亂的聲波,接著(zhù)轉化為高頻聲波的能量,然后完成從高頻能量到低頻能量的轉化,直到整個(gè)系統的穩定。
- JIA Haijun,LI Yi,XIAO Zhi,et al.Study of system and evaporation process of a multi-tower VTE-MED coupled with nuclear heating reactor[J].Nuclear Power Engineering,2003,24 (6):101-104(in Chinese). [2]賈海軍;李毅;肖志;等.;與核供熱堆耦合的海水淡化系統及蒸發(fā)工藝研究[J]
- Based on the temperature difference of various heat storages, the utility target of batch process heat integration with heat storage is determined by the secondary cascade approach. 在分析各種熱貯存傳熱溫差的基礎上,確定了帶熱貯存的間歇過(guò)程最小公用工程。
- Power Demonstration Reactor Program 示范動(dòng)力反應堆計劃
- The use of refinery gas has a number of technical and operability advantages over direct combustion of coal or coke for radiant process heating. 同直接燃燒煤或焦碳進(jìn)行輻射加熱相比,用煉廠(chǎng)氣進(jìn)行加熱具有技術(shù)上和適用性上的雙重優(yōu)勢。
- Abstract: PHOENICS-3.2, a three dimension CFD code, is used to simulate the heat transfer and flow in the bypass and the upper plenum of the core of 200 MW nuclear heating reactor (NHR-200). 摘 要: 應用三維CFD軟件PHOENICS-3.;2,計算了200MW低溫供熱堆(NHR-200)堆芯旁通區及上腔室的流場(chǎng)和溫場(chǎng)。
- Abstract The power automatic control system on nuclear heating reactor (NHR) is a multi input &multi output non linear system. 摘要 核供熱堆功率自動(dòng)控制系統是一個(gè)多輸入多輸出的非線(xiàn)性系統。
- At the request of the outside world has led to the photocuring and process heating and drying, and so on. 外界的請求導致了紫外平固化和加冷潮濕等工藝的不敗不幼。
- The technology for the low temperature nuclear heating reactor (NHR) is developed independently and its property right is completely owned by China. 低溫核供熱堆技術(shù)是我國獨立開(kāi)發(fā)的擁有完全自主知識產(chǎn)權的高新技術(shù)。
- solar industrial process heat system 太陽(yáng)能工業(yè)過(guò)程加熱系統
- Yesterday, analysts said the IEA move suggested backing for nuclear power could now build, ending decades of moratoriums and stalled reactor programmes in the wake of the Chernobyl disaster 20 years ago. 分析師昨天表示,國際能源機構的舉措表明,對核能的支持現在可能會(huì )增加,從而結束20年前切爾諾貝利災難后核能建設的中止以及反應堆項目延期的局面。
- By using the code, the steady-state heat-removed capacity of the passive natural-circulation residual-heat-removed system for 200MW Nuclear Heating Reactor (NHR-200) is calculated. 運用SAC-PREARS程序對200MW核供熱堆非能動(dòng)自然循環(huán)余熱排出系統的穩態(tài)自然循環(huán)載熱能力進(jìn)行了計算;
- The heat treater has no process control program of any type. 熱處理方?jīng)]有任何過(guò)程控制的方法。
- It is a leap in the process of cognition. 這是認識過(guò)程的一次飛躍。