您要查找的是不是:
- Unique 3 point load bearing design for smooth operation. 獨特的3點(diǎn)負載支撐結構,有利于平穩運行。
- Full is my tears, load bearing I is being brokenhearted. 滿(mǎn)是我的淚水,承載著(zhù)我心碎。
- The W3wp. Exe process hosting the service was the primary load generator. 駐留該服務(wù)的W3wp.;exe進(jìn)程是主要的負載生成器。
- Outlook 2007 is the primary load generating client for a number of Exchange services, including Autodiscover and Exchange Web Services in particular. Outlook 2007是許多Exchange服務(wù)(特別是自動(dòng)發(fā)現服務(wù)和Exchange Web服務(wù))的主要負載生成客戶(hù)端。
- On a per-process basis, the W3wp. Exe process hosting the services was the primary load generator, averaging 70.7 Percent CPU utilization. 以每個(gè)進(jìn)程為基準;駐留各項服務(wù)的W3wp.;exe進(jìn)程是主要的負載生成器;它的CPU平均利用率為70
- The load bearing part of a structure, in exhibition work usually a box-like timber frame. 結構的承重部分,在展覽業(yè)務(wù)中通常指箱形的木頭框架。
- IF BACKPACK/DUFFLE BAGS ETC., THE LOAD BEARING STRAPS MUST BE FLAG STITCHED IN PLACE TO ENSURE THAT THEY DO NOT BREAK UNDER STRAIN. 諸如背包,行李袋等,承重帶必須加縫,以確保在受力情況下不會(huì )斷裂!
- This achieves an effective load bearing of the full strain off the wooden structure, thus optimising safety. 這進(jìn)一步強化了木質(zhì)音箱結構的堅固度,更為安全可靠。
- The resulting benefits are high stiffness and load bearing at low weights and with low warpage. 最終帶給產(chǎn)品的好處是在低重量和低翹曲情況下體現出的高剛性和承載能力。
- ConclusionSclera of high myopia is more flexibly and its load bearing capacity is lower than emmetropia . 結論高度近視眼與正常眼相比更容易發(fā)生變形,具有較低的承載能力。
- The existence of a relatively hard layer just below the raft can remarkably enhance the load bearing action of raft. 地表硬殼層的存在能夠有效地提高筏板的分擔作用。
- IF BACKPACK/ DUFFLE BAGS ETC., THE LOAD BEARING STRAPS MUST BE FLAG STITCHED IN PLACE TO ENSURE THAT THEY DO NOT BREAK UNDER STRAIN. 諸如背包,行李袋等,承重帶必須加縫,以確保在受力情況下不會(huì )斷裂!
- The load operation of a three-phase induction-voltage regulator is presented briefly. The related data, phasor drawing and parameters in secondary circuit, primary load circuit and imput are analyzed. 簡(jiǎn)要介紹了三相感應調壓器的負載運行情況,對二次回路參數、負載時(shí)一次回路參數、輸入參數、相關(guān)數據和相量圖進(jìn)行了分析。
- Load bearing can happen only 24 hours after the foundation line laying is completed and, it is necessary to keep the indoor air circulating. 地腳線(xiàn)鋪設完畢后,在24小時(shí)后方可承重并要經(jīng)常保持室內空氣的流通。
- Creep tests were performed several times during monotonic primary loading, unloading and reloading. 既進(jìn)行了初始加載過(guò)程中的蠕變試驗,也做了卸載與重復加載過(guò)程中的蠕變試驗。
- Load bearing is allowed only 24 hours after the floor laying is completed, and, it is necessary to keep the indoor air circulating. 地板鋪設完畢后,在24小時(shí)后方可承重并要經(jīng)常保持室內空氣的流通。
- After the length of the gap increasing to a certain value the load bearing ability and actual shear strength intends to decrease. 研究中還發(fā)現間隙所處的位置對接頭的抗剪強度有較大的影響,膠層端部預留間隙使接頭的承載能力和實(shí)際強度均顯著(zhù)下降。
- The effect of hole on the SCF and load bearing capacity of composite laminate became more evident with increasing anisotropic degree. 隨著(zhù)材料各向異性程度的提高,開(kāi)孔損傷對板件的應力集中因數和承載能力的影響增大。這一結果在試驗中得到證實(shí)。
- A new method is presented to analyze the vertical load bearing performances of prefab piles with optimization and back analysis techniques. 對預制樁的豎向承載性能進(jìn)行計算研究,提出了一種分析預制樁豎向承載性能的新方法。
- A national design also is the national culture constituent, at the same time it load bearing culture dissemination historical heavy responsibility. 一個(gè)國家的設計也是民族文化的組成部分,它同時(shí)承載著(zhù)文化傳播的歷史重任。