您要查找的是不是:
- Is the main part of the water control project. 就是木蘭陂的主體工程部分。
- Now has a Qingtongxia Water Control Project. 現建有青銅峽水利樞紐工程。
- Consequently, the research on cost control project of YongChang Power Plant has a relatively realistic meaning. 因此,研究永昌電廠(chǎng)成本控制方案具有較大的現實(shí)意義。
- NANJING YONGHUI ELECTRIC POWER CONTROL ENGINEERING CO., LTD. 南京永惠電力控制工程有限公司。
- Installed wigh power control device to ensure safety. 設有電控安全保護裝置,操作絕對安全。
- Power control unit is the key part of control system. 功率控制單元是控制系統的核心部件。
- One is Mulanbei, a water control project of the Song Dynasty. 一個(gè)呢就是宋代的水利工程木蘭陂。
- Dalong Water Control Project is a key project in Hainan Province. 摘要大隆水利樞紐工程是海南省的重點(diǎn)工程。
- The invention discloses a gate driving circuit and a power control circuit. 本發(fā)明公開(kāi)了一種柵極驅動(dòng)電路與電源控制電路。
- THE ANALYSIS ON THE SITUATION OF THE TUBERCULOSIS CONTROL PROJECT IN ZHUHAI. 珠海市結核病控制現狀分析。
- And through the experiment of the burnable adjustment of the boiler and according to this we find out the operation control project, so the problem of coke of #5 boiler of Da La Te Power Plant get the basic solution. 通過(guò)對鍋爐的燃燒調整試驗及基于此的運行控制方案,達拉特發(fā)電廠(chǎng)%235鍋爐結焦問(wèn)題得到基本解決。
- Present a design of the Emissive Microwave Power Control used for the UHF RFID Reader. 介紹一種用于適用于超高頻段以上的射頻讀寫(xiě)器功率控制方案。
- This power control automation system will realize telemeter, tele-signaling, tele-control and tele-regulation in power network. 這種電力控制自動(dòng)系統可實(shí)現電網(wǎng)中的遙測、遙信、遙控和遙調。
- The Chinese government has increased investment in flood control project construction since last year. 去年以來(lái),國家加大了對防洪工程建設的投入。
- Variable optical attenuator(VOA)is a key power controlling device which can realize channel equalization and automatic gain control(AGC). 光可變衰減器(VOA)作為波分復用(WDM)網(wǎng)絡(luò )中關(guān)鍵的功率管理器件;能夠實(shí)現信道均衡和自動(dòng)增益控制功能.
- The foundation treatment for Dalong Water Control Project mainly consists of vibro-compaction and vertical anti-seepage. 摘要大隆水利樞紐工程壩基處理主要包括振沖加密和垂直防滲工程。
- Sum of active power control ranges of the generating sets acted upon by the system regulator. 系統調節器作用的各發(fā)電機組有功功率調節范圍的總和。
- In order to run the deployed solution, on the target device, deploy and register the ActiveX control project first. 要運行部署的解決方案,首先需要在目標設備上部署和注冊ActiveX控件項目。
- It also discusses QoS,safe problem,power control of Ad Hoc network,and put forward an outlook about the future. 首先介紹了Ad Hoc網(wǎng)絡(luò )結構,然后從分層角度出發(fā),探討了各個(gè)層的功能和關(guān)鍵技術(shù),最后簡(jiǎn)要論述了Ad Hoc網(wǎng)絡(luò )的QoS、安全問(wèn)題和功率控制,并對其未來(lái)提出了展望。
- THE EVALUATION AND ANALYSIS ON PATIENT'S DETECTION AND TREATMENT RESULT OF TB CONTROL PROJECT IN YONGZHOU PREFECTURE. 永州市結核病控制項目病人發(fā)現和治療結果評析。