Piling deviation has always been crucial for quality control of pile foundation engineering of piled wharves. 高樁梁板式碼頭樁基施工中,樁的偏位問題始終是樁基工程質量控制的重點。
The bored pile-group is used for the foundation of the main pylon piers and a drilling platform will be used as temporary facilities for construction of the pile foundation. 主塔墩基礎采用鉆孔灌注樁群樁基礎,采用鉆孔平臺作為樁基施工臨時設施。