您要查找的是不是:
- The full bias voltage appears across RL2. 全部的偏置電壓出現在RL2上。
- Sum up experiences in the production of box girder. 就制作箱形梁總結制作中經(jīng)驗及體會(huì )。
- The main studying object is the transverse dolly of the box girder. 本論文主要研究的內容為:針對兩側箱梁橫移車(chē)運動(dòng)需要同步的要求,對箱梁橫移車(chē)的推進(jìn)液壓系統及運動(dòng)同步控制系統進(jìn)行分析和設計。
- The construction of full span box girder precasting is complicated with more procedures and short of engineering quota data,it is comparatively difficult to determine the labour cost. 整孔箱梁預制施工復雜,工序較多,目前缺少定額資料,因而工費確定比較困難。
- The full bias voltage appears across RL2 (the leakage resistance between the inside and outer shields of a triax cable). 在RL2(同軸電纜內、外屏蔽之間的漏阻)上存在滿(mǎn)偏置電壓。
- The scheme is a transition between the box girder with vertical piers and the true arch. 該結構是具有垂直墩的箱梁橋鋼與真正的拱橋之間的一種過(guò)渡形式。
- Failure analysis of side rail box imitating chief beam of metallurgy crane was studied. Cause of fatigue failure and improving method were given. 介紹了冶金起重機金屬結構偏軌箱形模擬主梁的疲勞失效分析研究結果,提出疲勞失效的原因及改進(jìn)措施。
- The successful alternative was the cast-in-place segmental prestressed concrete box girder. 最后采用的方案是分段現澆的預應力混凝土箱形梁。
- Each bundle of strands is connected to one side of the center web of the two cell box girder. 每束鋼纜錨固在雙箱梁的中間腹板的一側。
- The circuit shows that the full bias voltage appears across the insulator leakage resistance (RL), so a leakage current (IL) will be added to the measured ion current (IM = IX + IL). 電路顯示,在絕緣體漏泄電阻(RL)上出現了滿(mǎn)偏置電壓,因此漏流(IL)將被疊加到被測離子流(IM=IX+IL)。
- The paper analyses the nonlinear cracking behavior of reinforced concrete box girder. 對鋼筋混凝土箱梁受力開(kāi)裂破壞的非線(xiàn)性機理進(jìn)行了研究。
- This paper introduces structure of waveform steel web prestress concrete box girder and construction method for several bridges. 介紹了波形鋼腹板預應力混凝土箱梁的結構和幾座橋梁的施工方法。
- Construction technical of the elected bridge monolithic box girder was briefly introduced. 摘要簡(jiǎn)要介紹了城市軌道交通中運架一體式架橋機架設高架橋整孔箱梁的施工技術(shù)。
- Then the modem design method-optimum design to box girder is adopted by two methods (including finite element method). 用兩種方法(包含有限元分析方法)對箱形梁橋架進(jìn)行優(yōu)化設計。
- In cross section the total deck width is1158 ft with the torsionally rigid spine box girder having a width of39 ft4 in. 橫斷面上,橋面總寬115.英尺,其中具有抗扭剛度的脊骨箱梁寬39英尺4英寸。
- This paper introduces the construction technique for hoisting prestressed concete box girder. 本文介紹了預應力箱梁的吊裝施工技術(shù)。
- The multi-scale damage analysis method for steel box girder is presented with respect to Runyang Cable-stayed Bridge. 以潤揚大橋斜拉橋為分析對象,提出了扁平鋼箱梁結構的多尺度損傷分析方法。
- The mode of temperature gradient of this bridge s box girder is developed by the method of nonlinear regression. 采用非線(xiàn)性回歸的方法,提出了該橋混凝土箱梁的溫度梯度模式。
- Design and Integral Movement of Bottom and Side Plate of Cast-in-site Box Girder by all-round Supports Construction for Yiyang Bridge No. 益陽(yáng)三橋滿(mǎn)堂式支架現澆箱梁的底模、側模設計及整體移動(dòng)。
- The deck is an orthotropic steel box girder of aerofoil shape with cantilevered cycle tracks and footway supported from the box. 橋面板采用翼型正交異性鋼箱梁結構,由鋼箱支撐起懸臂式自行車(chē)專(zhuān)用道和人行道。