您要查找的是不是:
- pile driving plant 打樁裝置
- pontoon pile driving plant 水上打樁機
- The deflection of precast piles and excavation problems induced by pile driving are introduced through an engineering case of pile foundation treatment of a power plant. 通過(guò)某電廠(chǎng)樁基處理工程實(shí)例,介紹了打樁引起的預制樁偏位及開(kāi)挖問(wèn)題。
- The discussion on rebuild of driving frame on floating pile driver 打樁船樁架加高改造探索
- Welding, pile driving, spray painting, excavation and heavy lifts are examples of jobs that are suitable for JHA. 焊接、打樁、噴涂、開(kāi)挖和重型設備等諸如此類(lèi)的工作較為適合進(jìn)行作業(yè)危險性評估。
- The main structures with strength checking include the stanchion,the upper platform and the base seat.The suggestions about the safety of the pile driving frame are put forward. 在此基礎上,進(jìn)一步對主樁架結構包括支柱、頂架平臺、支座等進(jìn)行了強度校核驗算,并對樁架的運行安全提出了建議。
- The cylindrical expansion combining with spatial axisymmetrical consolidation finite element method and modified Cam-clay model, is adopted to simulate pile driving. 采用空間軸對稱(chēng)固結有限元結合修正劍橋模型,用柱形孔擴張對沉樁過(guò)程進(jìn)行模擬,求出不同時(shí)期樁周土中的應力,從而得到不同間歇期樁側的最大摩擦力。
- The technology of grouting after pile driving at the bottom of pile makes up for some inherent defects caused by the bore cast-in-place pile protecting bore wall with mud and thereby it enhances the bearing capacity of pile greatly. 泥漿護壁鉆孔灌注有一定的缺陷,樁底后壓漿技術(shù)有效地彌補了這些缺陷,并能大幅度提高承載力。
- The main causes of breakage were concrete tube pile instability of foundation pit or failure of its bracing, soil squeeze due to pile driving, incorrect excavation and incorrect heap of soil. 摘要造成混凝土管樁傾斜與斷裂的主要原因為基坑邊坡失穩或支護結構破壞、沉樁擠土效應以及挖土與堆土不當等。
- Manufacture and installation of driving frame and installation debug of hydraulic system on floating pile driver 打樁船樁架制作安裝及液壓系統的安裝調試
- The treatment and effectiveness by use of prefabricated drains method to dissipate the excess pore pressure by pile driving are also introduced under the condition without external loads. 在不加外荷載情況下,采用塑料排水板方法消散打樁引起的超靜孔隙水壓力的處理措施,解決了高孔隙水壓力下主廠(chǎng)房的開(kāi)挖問(wèn)題。
- I have a huge pile of letters to deal with. 我有一大堆信件要處理。
- The ship ran a foul of the floating seaweed. 船和漂流的海藻糾纏在一起。
- He emphasized the importance of careful driving. 他強調小心駕駛的重要性。
- He was had up for dangerous driving. 他因危險駕駛而被控告。
- Strength calculation and analysis on pile holder of a floating pile driver 某打樁船樁架強度計算及分析
- I reached for a floating log with my foot. 我伸腳去鉤取一段漂浮著(zhù)的木頭。
- Compared with pile driving on land,driving steel sheet piles at sea is more difficult in positioning the piles and controlling the verticality of the piles. 相對于陸域海上施打鋼板樁,定位和垂直度控制難度較大。
- Have you seen my keys floating about (anywhere)? 你在什麼地方見(jiàn)到我的鑰匙了嗎?
- Because of soil squeezing effect and excess pore water pressur,reconsolidation settlement will occur around soil compaction piles in saturated soft clay during pile driving. 位于飽和軟粘土地基中的擠土樁,由于沉樁過(guò)程中地基土產(chǎn)生擠土效應及超靜孔隙水壓力,同時(shí)隨著(zhù)超靜孔隙水壓力的消散,樁周地基土產(chǎn)生再固結沉降。