Study of the regional stability and preliminary siting of the Anqing bridge are the important, basic work prior to the construction of the bridge. 安慶長(cháng)江公路大橋區域穩定性及預選橋位線(xiàn)方案是大橋建設前期的一項重要基礎性工作。
For the above-mentioned reasons, discussion is held on the controlling approach to the project cost in the prophase of capital construction. 基于此,對工程造價(jià)在基本建設前期的控制途徑進(jìn)行了分析。