您要查找的是不是:
- Maximum design flood discharge ofreservoir 在水庫大壩設計,水庫設計最大泄洪流量
- The design flood hydrograph is computed using observation discharge data. 利用實(shí)測流量資料推求設計洪水過(guò)程;
- The design flood hydrograph is computed using observation discharge data.3. 2、利用實(shí)測流量資料推求設計洪水過(guò)程;
- This paper presents the principle to be obeyed in design of gantry crane girder for flood discharge section of Three Gorges project,and its alternatives shall be compared. 介紹了三峽水利樞紐泄洪壩段門(mén)機大梁設計應遵循的原則和方案的比較選擇。
- First of all, scuttling Yu Lung (this yuncheng Hejin), flood discharge. 大禹首先鑿開(kāi)龍門(mén)(今運城河津市),分洪下泄。
- It is prohibited to plant trees or long-stalk crops impeding flood discharge in river courses used for flood discharge. 禁止在行洪河道內種植阻礙行洪的林木和高稈作物。
- Planting trees or long--stalk crops impeding flood discharge in river courses used for flood discharge. (三)在行洪河道內種植阻礙行洪的林木和高稈作物的。
- The flood discharge scene is magnificent, with whirlpools rotating and waves roaring. 泄洪時(shí)泡漩翻滾、水浪轟鳴,場(chǎng)面很壯觀(guān)。
- In this paper,introducing the way for ascertain design flood water level of inundate area using Saint-Venant equations and some special methods. 在內澇區采用圣維南方程組及一些特殊處理的方法來(lái)推求設計洪水位是比較科學(xué)的。
- The flood discharge tunnel of western banlieue reservoir of Sanyuan county was constructed in soil with high water content. 三原西郊水庫導流排沙泄洪洞工程是在地下水豐富的土體中修建的,水文地質(zhì)條件復雜,施工難度很大。
- The potential boosting Limiting stage during flood is analyzed by checking design flood and studying interval and substage flood.2. 與此同時(shí),通過(guò)對水庫設計洪水的復核以及對區間洪水和分期洪水的研究,分析了汛限水位抬高的潛力。
- Seasonal design flood should not only satisfy the flood prevention standard but also reflect seasonal variation characteristics. 分期設計洪水既要滿(mǎn)足防洪標準,又能反映洪水的季節性變化特征。
- The use of land and shore lines within the scope of control for any river course or lake should conform to the requirements for flood discharge and water flow. 第二十二條河道、湖泊管理范圍內的土地和岸線(xiàn)的利用,應當符合行洪、輸水的要求。
- A kind of high strength silica fume concrete C70, which is of good cavitation resistance and abrasion resistance, is used in the Xiaolangdi flood discharge project. 小浪底泄洪工程中采用了抗空蝕、耐磨性能好的 70MPa高強度等級C70硅粉混凝土 .
- Article 22 The use of land and shore lines within the scope of control for any river course or lake should conform to the requirements for flood discharge and water flow. 第二十二條河道、湖泊管理范圍內的土地和岸線(xiàn)的利用,應當符合行洪、輸水的要求。
- Whet her the design is success or not has the direct relation with the outlet of the flood discharging on the left bank of the main trunk canal and the canal safety. 分布廣,工程規模差別很大,它的設計能否成功直接關(guān)系到左岸的洪水出路及總干渠的安全問(wèn)題。
- According to presentations, the second phase project of the Three Gorges Project mainly includes bids such as the flood discharge dam, the factory protection dam and the factory buildings, etc. 據介紹,三峽工程二期工程主要包括泄洪大壩、廠(chǎng)房大壩及廠(chǎng)房等標段。
- Dujiangyan Irrigation Project takes advantage of nature and energy of water itself to have successfully realized flood discharge,irrigation and cleanup sand,as well as sustaining development. 都江堰利用水的習性和自身能量,成功實(shí)現了排洪、灌溉、除沙三大目標,并且實(shí)現了可持續利用和發(fā)展。
- The main methods for calculating designed flood are probable maximum precipitation and hydrologic frequency analysis. 設計洪水計算方法主要是可能最大降雨和水文頻率法。
- The ski-jump energy dissipation is designed for flood spillway of Shuibuya hydropower project, with maximum discharge of 18 280 m3/s, water fall of 171 m, flood discharge power of 31 thousand MW. 水布埡水電站溢洪道采用挑流消能;最大下泄流量18280m3/s;泄洪落差171m;泄洪功率3.;1萬(wàn)MW。