您要查找的是不是:
- This is the BHA[bottom hole assembly] log. 這是井下鉆具組合的記錄本。
- Make up bottom hole assembly (BHA). 組合下部鉆具。
- Please pull out of hole and change bottom hole assembly! 請起鉆,換下部鉆具結構!
- Computer simulation of drillstring axial vibration and online monitoring of bottom hole condition. 鉆柱軸向振動(dòng)仿真與井底狀態(tài)監測方法探討。
- According to this problem,this paper proposes a modified isochronal well test with bottom hole liquid loading. 針對這個(gè)問(wèn)題,提出了一種存在井底積液時(shí)的修正等時(shí)試井資料解釋方法。
- Bottom hole pressure changes complicatedly in suction well of double porosity reservoir. 雙重孔隙介質(zhì)油藏油井抽汲生產(chǎn)將使井底壓力變化十分復雜。
- A kind of rotary steering stabilizer used in a common rotary bottom hole assembly to control well path was developed. 在普通旋轉鉆具的基礎上,研制了一種旋轉的近鉆頭穩定器,它可以將鉆柱穩定在井眼截面的需要位置,以控制井眼軌道。
- The basic assumptions, equations and boundary conditions for bottom hole assembly (BHA) analysis were discussed. 討論了下部鉆具組合分析的基本假設、基本方程和相應的邊界條件。
- The modified isochronal well test data with bottom hole liquid loading will have abnormity, causing a fail of processing with the original theory or much error. 摘要存在井底積液的修正等時(shí)試井資料會(huì )出現異常,使原有理論無(wú)法處理相應的測試資料或處理的結果誤差較大。
- With the fractal geometry theory, this paper puts forward a new rock drillability testing method by selecting detritus from bottom hole as object. 利用分形幾何理論,研究了鉆井過(guò)程中巖石破碎機理及形成過(guò)程,提出了一種以井底返出的巖屑為對象的巖石可鉆性測試方法。
- The bottom hole flow physical model of a kind of PDC coring bits is established considering the effect of junk slot and teeth layout in this paper. 以一種現場(chǎng)常用的PDC取心鉆頭為原型,充分考慮排屑槽和切削齒對于井底流動(dòng)的影響,建立了與實(shí)際相接近的PDC取心鉆頭井底流場(chǎng)的物理模型。
- With the progress of drilling technology, bottom hole assembly (BHA) has been developed rapidly to control well trajectory. 隨著(zhù)鉆井技術(shù)的進(jìn)步,以控制井眼軌道為目的的下部鉆具組合發(fā)展迅速。
- In routine overbalanced drilling, the bottom hole pressure towers above the formation pressure so that the mud fluid will leak into the formation. 常規過(guò)平衡鉆井方式打開(kāi)油氣層時(shí),井底壓力高于地層壓力,鉆井流體會(huì )向地層滲濾甚至漏失。
- The modified isochronal well test data with bottom hole liquid loading will have abnormity,causing a fail of processing with the original theory or much error. 存在井底積液的修正等時(shí)試井資料會(huì )出現異常,使原有理論無(wú)法處理相應的測試資料或處理的結果誤差較大。
- The given reservoir dimensionless pressure express formula and pressure drop curves can be used in condensate gas wells and the gas wells with accumulated fluid in bottom hole. 給出的氣藏無(wú)量綱壓力表達式及壓降曲線(xiàn),還可適用于凝析氣井及井筒帶積液的氣井。
- In the course of transmission, mud pulse signal mainly disturbed by drilling pump,engine in the bottom hole, air bladder contained in mud and movement of drilling equipment. 泥漿脈沖信號在傳輸過(guò)程中主要受鉆探泵、井底動(dòng)力機、泥漿中的氣泡及活動(dòng)鉆具的干擾;
- The influence of wellbore storage, skin factor, interporosity flow coefficient and elastic storativity ratio to the bottom hole pressure of the observation well were analyzed. 分析了井筒儲存、表皮系數、竄流系數以及彈性?xún)θ荼葘τ^(guān)測井井底壓力的影響。
- A mechanical model of bottom hole assembly (BHA) with eccentric bits is established and the solution of this model was given by means of numerical method. 采用靜力分析的方法,建立了偏心鉆頭底部鉆具組合的力學(xué)模型,并完成了對力學(xué)模型的求解。應用數值計算方法,分析了偏心鉆頭底部鉆具組合的受力和變形特性。
- It is important for directing timely the drilling engineering to forecast and try to get the data under the undrilled sub bottom hole pressure during the drilling. 在鉆井過(guò)程中,準確求取或預測出井底以下尚未鉆遇地層的壓力,對實(shí)時(shí)指導鉆井作業(yè)具有重要的意義。
- His strength in a crisis is an ace in the hole. 臨危不懼是他的看家本領(lǐng)。