As a result,the short hole shrinkage method with flat bottom structure was employed to mine the stope firstly,then stoping ore pillar by medium length hole caving method. 后溝金礦采用平底結構淺孔留礦法先采礦房,后用中深孔崩落法回采礦柱,經(jīng)兩年多的生產(chǎn)實(shí)踐,取得較好的技術(shù)經(jīng)濟指標。
The results of numerical simulation showed that if the floor pillar is mined partially, the stress in pillars will sharply increase, so integral stability of mine may weaken. 模擬結果表明,部分底柱抽采后,起關(guān)鍵支撐作用的底板橫撐和礦柱中的應力有顯著(zhù)地變化,這可能破壞礦山整體穩定性。