您要查找的是不是:
- If actual data was entered for the task, the actual start date is displayed, along with the data that initiated the task. 如果輸入了任務(wù)的實(shí)際數據,則顯示實(shí)際開(kāi)始日期和啟動(dòng)任務(wù)的數據。
- AS Actual Start Date ASAP As-Soon-As-Possible As-built Design 實(shí)際建造設計
- actual start date 實(shí)際開(kāi)始日期
- In the From box, choose your start date and time. 在“從”框中,選擇起始日期和時(shí)間。
- The start date must be before the end date. 開(kāi)始日期必須早于結束日期。
- This is the series for Start Date. 此系列表示“開(kāi)始日期”。
- Your project start date is March 1. 項目開(kāi)始日期為3月1日。
- What's the start date of the Olympics? 奧運會(huì )的開(kāi)幕日期是幾月幾日?
- Please specify a valid start date. 請指定一個(gè)有效的起始日期。
- Gets or sets the starting date and time of the selection range. 獲取或設置選擇范圍的起始日期和時(shí)間。
- The ending date must be set later than the starting date. 結束日期必須要設得比開(kāi)始日期晚。
- The strange starting date embedded in the original IBM PC. 輸入于最早的IBM個(gè)人電腦中的陌生起始日期。
- Start_date is a date that represents the starting date. Start_date是代表開(kāi)始日期的一個(gè)日期。
- Starting date and time for the reporting interval in UTC. 報告間隔的開(kāi)始日期和時(shí)間,使用UTC時(shí)間表示。
- In the Start Date box, enter the date when the task begins. 在“開(kāi)始日期”框中,輸入任務(wù)開(kāi)始的日期。
- If the task is 100% complete, the upper bar shows the actual start and finish dates. 如果任務(wù)100%25完成,則靠上的條形圖顯示實(shí)際的開(kāi)始日期和完成日期。
- How does the project start date affect the schedule? 項目開(kāi)始日期如何影響日程?
- Take note of the project start date in the Start date box. 記錄下“開(kāi)始日期”框中的項目開(kāi)始日期。
- Prior to your actual start of motorcycle stunt riding, what did you think of it. What were the things you expected? 在你開(kāi)始摩托車(chē)特技駕駛前,你是怎樣看待摩托車(chē)特技的?你對特級有何期待?
- We actually started the reform in 1980. 我們真正干起來(lái)是一九八零年。