The process and methods of the non-cohesive pre-stressed concrete construction of the Xiaolangdi desilting tunnel could be used in the similar projects for reference. 小浪底排沙洞無(wú)粘結預應力混凝土施工的施工程序和施工方法對類(lèi)似工程有參考價(jià)值。
Field data shows that erosions happened in the whole reach of the Lower Yellow River during the storage periods of the Sanmenxia Reservoir and the Xiaolangdi Reservoir. 根據實(shí)測資料分析,在三門(mén)峽水庫和小浪底水庫攔沙期黃河下游均發(fā)生持續沖刷。