To meet the steam demand for full-load operation of existing 4 500 kW power generator sets and sulphuric acid demand in local market, a 150 kt/a sulphur-burning sulphuric acid plant was installed.

 
  • 為保證原有4 500 kW發(fā)電機組滿(mǎn)負荷運行的蒸汽供給及考慮當地硫酸市場(chǎng)的需求,新建一套150 kt/a硫磺制酸裝置。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan