To complete the well production, casing is installed and cemented and the drilling rig is dismantled and moved to the next site.

 
  • 要完成以及生產(chǎn),套管安裝和硬質(zhì)合金和鉆機是拆除和移動(dòng)到下一個(gè)站點(diǎn)。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan