This paper describes the problems encounted in the design of instrumentation and automatic control system for the first mixed C_4 solvent deasphalting unit built in China as well as the measures adopted to surmount these problems.

 
  • 本文從儀表、自控系統的角度;介紹了我國第一套混合C_4溶劑脫瀝青裝置設計中遇到的問(wèn)題及采取的措施.
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan