The water intake and outlet of power plant in tidal river bend is researched by model test with adopting W shaped rippled groove which meets the request of model roughness.

 
  • 摘要進(jìn)行了潮汐彎道段電廠(chǎng)取排水模型試驗,采用W形波紋凹槽方式加糙,使模型糙率達到了模型試驗的要求。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan