The tangency point of Bottom Hole Assembly is located at where the drill string just touches the wall of the borehole, and the contact force is zero here.

 
  • 在計算底部鉆具組合的受力和變形時(shí),以前一般都是按彎矩為零的條件來(lái)確定其上切點(diǎn)的位置。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan