The seepage field analysis at the higher reservoir level shows that the reservoir water seeps through the blocks No. 18 and 22 and the foundation of the right grouting adit,directly replenishes the groundwater of the right abutment.

 
  • 較高庫水位時(shí)的滲流場(chǎng)分析表明,庫水滲過(guò)18~22壩段和右灌漿平洞基礎,直接對右壩肩地下水進(jìn)行補給;
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan