The safety monitoring of a 50 000 m 3 oil tank foundation with many embedded prototype observation devices shows that, it is practicable to use cement deep mixing piles to improve mucky clay of 20 m in thickness and 26 m in depth.
英
美
- 通過(guò)一座樁身和土體中埋有各種觀(guān)測儀器的 5× 1 0 4 m3 油罐地基試驗 ,結果表明用超長(cháng)水泥土攪拌樁處理 2 6m深、2 0 m厚的淤泥質(zhì)粘土是可行的。