The impervious wall of this project is located in water bearing sand and gravel, the collapse hole takes place due to some factor affect, the deep well lower water level measures are adopted.

 
  • 本工程防滲墻在富含水砂卵礫石地層施工中,由于各種因素引起嚴重塌孔,施工中采用了深井井上降水措施。