The flows within the entire system must be carefully balanced in large scale and long distance water diversion projects with multistage pump stations.

 
  • 為了保證大型長(cháng)距離多級泵站引水工程運行中全系統的流量平衡,建立了全系統的仿真模型。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan