The engineering practice proves that after the foundation is consolidated by mortar pouring into pipe, pipe-jacking course is about the same as that in the original gobi desert soil without groundwater, and the desired result is achieved.

 
  • 實(shí)踐證明,基礎經(jīng)小導管注漿加固處理后,其頂進(jìn)過(guò)程與原狀、地下水戈壁土的基本相同,達到了預期的目的。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan