Secondly the paper explains how to establish the cost counting system with ABC (Activity-Based Costing) and the cost analysis system with ABM (Activity-Based Management).

 
  • 其次建立以作業(yè)成本計算(ABC)為基礎的成本計算系統,以作業(yè)管理(ABM)為基礎的成本分析系統;
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan