Procedures of the following aspects should be reviewed: the sub-contracting system; site inspection; the effectiveness of inspections and tests; and the monitoring work conducted by an independent third party.

 
  • 這方面涉及的問(wèn)題包括:分判制度;地盤(pán)實(shí)地的巡查;檢驗及測試的成效;以及由獨立第三者所進(jìn)行的監察。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan