Prior to the operation of the closed low flow drainage system, the Permit Holder shall provide a temporary drainage system to collect rainfall and irrigation water to the reservoir.

 
  • 在密封低流量排水系統運作前,許可證持有人須提供一個(gè)臨時(shí)的排水系統,以收集雨水及灌溉用水至水塘。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan