Presedimentation basins are constructed in excavated ground or out of steel or concrete: Steel and concrete tanks are often equipped with a continuous mechanical sludge removal apparatus.

 
  • 預沉池挖掘建造于地下或由鋼筋混凝土制成。鋼筋混凝土的沉淀池通常裝有機械排泥裝置。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan