Once a penetrating chink appears, it should firstly plug up at a vortex pot on the water side of the dyke, with auxiliary drainage added on the land side.

 
  • 貫穿性漏洞出現后,首先應找準漏斗,外堵為主,配以?xún)葘?搶險的重點(diǎn)應放在迎水面。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan