On this event, the Party responsible for the delays (Seller in delivery or Buyer in unloading) will have to bear the costs for the extension of the validity of the Letter of Credit as well as the costs of storage in the Port of Loading.

 
  • 如延長(cháng),承擔延遲責任的一方(賣(mài)方因交付或買(mǎi)方因卸貨)必須承擔延長(cháng)信用證有效期和存儲在裝貨港的費用。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan