On the heavy silt-laden rivers, desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head, but also for the runoff river hydropower station with lower water head.
英
美
- 摘要在多沙河流上,無(wú)論是高壩大庫的高水頭電站,還是低水頭河床式樞紐,電站進(jìn)水口的取水排沙歷來(lái)是一個(gè)倍受關(guān)注的問(wèn)題。