On similar projects, with 50m span length (single spans, cantilevering 1/5), the cycle time is usually approx. 10 - 12 days without steam curing, reinforced in-situ by hand.

 
  • 類(lèi)似項目50米跨(單線(xiàn),1/5懸臂)沒(méi)有使用蒸汽養生和預制鋼筋籠,一個(gè)工作循環(huán)為10-12天。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan