MTRCL needs a further extended portion of 460 metres to allow the Airport Railway and Tung Chung Line to operate at full design capacity.

 
  • 地鐵公司必須把掉頭隧道部分再延長(cháng)460米,讓機場(chǎng)隧道與東涌線(xiàn)能以最高載客量運作。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan