Influenced by the Planned System,survey and design body has long neglected the multi-object feature of project,so the benefit of some construction attendants cannot be met adequately.

 
  • 勘察設計單位長(cháng)期以來(lái)受計劃體制模式影響,忽視了項目的多目標屬性,使項目相關(guān)者的利益沒(méi)有得到充分的滿(mǎn)足。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan