In this paper,three typical scheme design on mucking and transporting system of tunnel boring machine is studied,and the dispatch of the equipment in .

 
  • 本文在研究隧洞掘進(jìn)機開(kāi)挖隧洞出碴及材料運輸三種典型方案后,對其調度方案進(jìn)行了設計計算。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan