In this paper,the authors improved and developed the practical formulas in the document [1] ,and discussed the method and principle for checking the integrate stability of drilling mast when there are primary defects.

 
  • 本文以文獻[1]為基礎,通過(guò)對實(shí)用計算公式的適當修改和擴充,討論了存在初始缺陷時(shí),校核井架總體穩定性的方法和原理。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan