In the test of the large diameter longhole mining of No.91 orebody at Tongkeng mine,the stress and the displacement of wall rock at the stope drilling chamber were monitored.

 
  • 在銅坑礦91號礦體大直徑深孔采礦法試驗過(guò)程中,對采場(chǎng)鑿巖硐室圍巖的應力狀態(tài)和巖移進(jìn)行了監測。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan