In the process of tunneling, the means of deformation surveying and monitoring was adopted, and the monitoring results shows that it is effective to control the fall of roof by mans of timely primary support.

 
  • 施工過(guò)程中,采用了變形監測手段,監測結果表明,及時(shí)的初次支護是控制拱頂下沉的有效措施。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan