In addition, because of the large pipe diameter, more bore expanding levels are needed, and it interferes with stratum by impact.

 
  • 加之穿越管徑大,擴孔級數較多,對地層的沖擊擾動(dòng)較大,增加了塌孔的可能性,施工難度很大。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan