If the design bidding of conceptual construction project schemes is conducted, the tenderee shall pay 80% of the phased scheme design fee as set by the state to the bid winner.

 
  • 采用建筑工程概念性方案設計招標的,招標人應按照國家規定方案階段設計付費標準的80%25支付中標人。