Five-yearly operational testing should be done by lowering the boat loaded to a proof load of 1.1times the maximum working load of the winch, or equivalent load.

 
  • 五年度操作測試應該使船裝載超過(guò)最大裝載負荷的1.;1倍或者等于裝載負荷的貨物,然后下沉。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan