During unit 5 starting-up and 168h full load trial operation in a power plant, the boiler water-cooling wall tube burst happened, by comprehensive analysis, finds out the tube existing interlayer is mainly caused of water-cooling wall tube burst.
英
美
- 某發(fā)電廠(chǎng)%235機組在整套啟動(dòng)168h滿(mǎn)負荷試運行期間,鍋爐水冷壁管發(fā)生爆破,通過(guò)對水冷壁爆破管進(jìn)行綜合分析,指出管子存在夾層和夾雜物是此次爆管的主要原因。