Comprehensively considered the characters of scheduling problem in iron and steel enterprise, a steelmaking-casting-rolling integral scheduling method based on CSP was designed by means of object-oriented design pattern.
英
美
- 摘要綜合考慮鋼鐵企業(yè)調度問(wèn)題的特點(diǎn),利用面向對象的設計模式,提出了基于約束滿(mǎn)足方法的冶、鑄、軋一體化生產(chǎn)調度方法。