Before the 168 IOD service project was on line, pressure test was needed to test if system s pressure burden ability is up to predicted.

 
  • 移動(dòng)168信息點(diǎn)播業(yè)務(wù)系統擴容工程上線(xiàn)之前,為檢驗其是否能夠達到包括預期的負荷承受力,需要進(jìn)行壓力測試。
今日熱詞
目錄 附錄 查詞歷史
国内精品美女A∨在线播放xuan